Q2 2022 Hochschild Mining PLC Production Volume Call Transcript

Jul 20, 2022 / 01:30PM GMT
Operator

Good day, and welcome to the second quarter results of Hochschild. At this time, I would like to turn the conference over to Ignacio Bustamante. Please go ahead, sir.

Ignacio Bustamante - Hochschild Mining plc - CEO & Director

Thank you very much. Hello, and welcome to our conference call to discuss our second quarter production results. I'm Ignacio Bustamante. And in London, we have Eduardo Noriega, our CFO; and Charlie Gordon, our Head of Investor Relations. And in our Snip project, we have Tom Eliott, our Vice President of North America.

Gold production in the quarter was almost 86,000 gold equivalent ecobee ounces or 6.2 million silver equivalent ounces. The San Jose mine in Argentina recovered from it COVID impact in first quarter was over in Peru Inmaculada had a solid period. Overall, in the first half, we produced almost 167,000 gold equivalent ounces, and we remain on track to meet our full year guidance of between 360,000 to 375,000 ounces -- sorry, between 360,000 and 370,000 ounces. Which is very pleasing given that we are operating in

Already have an account? Log in
Get the full story
Access to All Earning Calls and Stock Analysis
30-Year Financial on one screen
All-in-one Stock Screener with unlimited filters
Customizable Stock Dashboard
Real Time Insider Trading Transactions
8,000+ Institutional investors’ 13F holdings
Powerful Excel Add-in and Google sheets Add-on
All data downloadable
Quick customer support
And much more...
30-Day 100% money back guarantee
You are not charged until the trial ends. Subscription fee may be tax deductible.
Excellent
4.6 out of 5 Trustpilot