Central Iron Ore Limited: Drilling Results Finalised

Author's Avatar
3 days ago

VANCOUVER, British Columbia, Sept. 18, 2024 (GLOBE NEWSWIRE) -- Central Iron Ore Limited (CIO – TSX.V) (“CIO” or “the Company”) is pleased to announce this Drilling Update.

Central Iron Ore is pleased to announce that the results for the 2024 Phase 1 RC drilling campaign have been finalised.

central-iron-ore-limited-figure1.jpg

Figure 1. The sun sets after the first day's drilling of the 2024 Phase 1 RC campaign at British King (M37/30)

Highlights:

  • Assay results for the 75-hole, 5 911-meter 2024 Phase 1 RC program has been received and processed.
  • Multiple significant intercepts exceeding has been intercepted across the target area (Table 1) some notable intercepts include;
    • 24BKRC_004: 5m @ 20.52g/t from 110 meters
    • 24BKRC_007: 3m @ 28.26g/t from 96 meters
    • 24BKRC_010: 2m @ 24.02g/t from 75 meters
    • 24BKRC_015: 3m @ 35.61g/t from 58 meters
    • 24BKRC_028: 7m @ 8.53g/t from 61 meters
    • 24BKRC_017: 2m @ 2.44g/t from 80 meters
      And: 1m @ 6.24g/t from 84 meters
      And: 2m @ 26.7g/t from 93 meters
    • 24BKRC_028: 7m @ 8.53g/t from 61 meters
  • Commencing in late September, 321 metres of Diamond Drilling (6 drillholes) will twin selected RC drillholes the showed exceptional gold endowment. The diamond drillhole core will provide invaluable structural, mineralogical and metallurgical information
  • The British King Mineral Resource is currently being updated to include the results of the recent drilling

Drilling Results
Interpretation of the RC drilling assay results has confirmed high grade gold mineralisation across the prospect area (Figure 3). A clear geological understanding of the ore body has been developed with gold mineralisation associated with a primary laminated bucky quartz lode with continuity for the entire 840m of strike targeted by the drilling campaign (Figure 3 to Figure 6). Mineralisation is open down dip and along strike.

central-iron-ore-limited-figure2.jpg

Figure 2. Section plan for the 2024 Phase 1 and historical drilling

central-iron-ore-limited-figure3.jpg

Figure 3. Pierce Point Long section of the 2024 RC results

central-iron-ore-limited-figure4.jpg

Figure 4. Section A-A': multiple significant high grade intercepts across multiple auriferous lodes have been identified

central-iron-ore-limited-figure5.jpg

Figure 5. Section B-B': multiple significant high grade intercepts have been identified

central-iron-ore-limited-figure6.jpg

Figure 6. Section C-C': multiple significant high grade intercepts across multiple auriferous lodes have been identified

Table 1. Significant Intercepts for the 2024 Phase 1 RC Campaign

TargetHole IDHole DepthDipAziCollar PositionSignificant Mineralised InterceptsComments
EastingNorthingARLFromToIntervalAvg. Grade
(Au g/t)
Metal (g*m)
British King - M37/3024BKRC_00158-603576908256326841445464711.291.291m @ 1.29g/t from 46 meters
and515327.1314.262m @ 7.13g/t from 51 meters
24BKRC_00286-603576908239326842445647061.307.806m @ 1.3g/t from 64 meters
24BKRC_00319-603576908218326841445-----NSI - abandoned before lode intercepted
24BKRC_004118-603576908198326840445110115520.52102.605m @ 20.52g/t from 110 meters
inc.110112248.0096.002m @ 48g/t from 110 meters
24BKRC_00560-603576908256326860445565935.5116.533m @ 5.51g/t from 56 meters
inc.5657111.5511.551m @ 11.55g/t from 56 meters
24BKRC_00689-603576908239326860445717436.3619.083m @ 6.36g/t from 71 meters
inc.7172111.7011.701m @ 11.7g/t from 71 meters
24BKRC_007110-6035769082173268604459699328.2684.783m @ 28.26g/t from 96 meters
inc.9698240.2080.402m @ 40.2g/t from 96 meters
24BKRC_008119-60357690819732685944511211316.036.031m @ 6.03g/t from 112 meters
24BKRC_00960-603576908256326877445495018.358.351m @ 8.35g/t from 49 meters
24BKRC_01085-6035769082413268774457577224.0248.042m @ 24.02g/t from 75 meters
inc.7677145.6045.601m @ 45.6g/t from 76 meters
24BKRC_011110-6035769082203268754459094412.8751.484m @ 12.87g/t from 90 meters
inc.9092224.9449.882m @ 24.94g/t from 90 meters
24BKRC_012104-603576908237326896445777928.6517.302m @ 8.65g/t from 77 meters
inc.7778116.2516.251m @ 16.25g/t from 77 meters
24BKRC_013110-6035769082203268964459496215.4430.882m @ 15.44g/t from 94 meters
inc.9495128.0028.001m @ 28g/t from 94 meters
24BKRC_014131-60357690820232689744510911011.271.271m @ 1.27g/t from 109 meters
and11411514.174.171m @ 4.17g/t from 114 meters
24BKRC_01583-603576908260326917445505111.431.431m @ 1.43g/t from 50 meters
and5861335.61106.833m @ 35.61g/t from 58 meters
inc.59601100.00100.001m @ 100g/t from 59 meters
24BKRC_01690-603576908239326916445686915.995.991m @ 5.99g/t from 68 meters
and7779224.9549.902m @ 24.95g/t from 77 meters
inc.7778148.3048.301m @ 48.3g/t from 77 meters
and8790315.1945.573m @ 15.19g/t from 87 meters
inc.8788137.2037.201m @ 37.2g/t from 87 meters
24BKRC_017107-603576908220326915445808222.444.882m @ 2.44g/t from 80 meters
and848516.246.241m @ 6.24g/t from 84 meters
and9395226.7053.402m @ 26.7g/t from 93 meters
and969822.094.182m @ 2.09g/t from 96 meters
24BKRC_018134-60357690820032691744510510618.868.861m @ 8.86g/t from 105 meters
and11411731.163.483m @ 1.16g/t from 114 meters
24BKRC_01966-603576908277326939445363826.6213.242m @ 6.62g/t from 36 meters
and626313.503.501m @ 3.5g/t from 62 meters
24BKRC_02086-603576908258326939445566042.6310.524m @ 2.63g/t from 56 meters
and768041.345.364m @ 1.34g/t from 76 meters
24BKRC_02190-603576908240326940445697453.5617.805m @ 3.56g/t from 69 meters
24BKRC_023128-60357690820032693844510911343.4113.644m @ 3.41g/t from 109 meters
12212316.166.161m @ 6.16g/t from 122 meters
24BKRC_02480-6035769082583269574455456213.9827.962m @ 13.98g/t from 54 meters
and737639.4728.413m @ 9.47g/t from 73 meters
inc.7374133.0033.001m @ 33g/t from 73 meters
24BKRC_02598-603576908239326957445747736.4519.353m @ 6.45g/t from 74 meters
and909224.078.142m @ 4.07g/t from 90 meters
24BKRC_02678-603576908260326976445535636.9720.913m @ 6.97g/t from 53 meters
24BKRC_02783-603576908239326978445787911.761.76Abandoned - flooded stoping intersected. 79m to 82m
24BKRC_02880-603576908259326997445616878.5359.717m @ 8.53g/t from 61 meters
inc.6162149.2049.201m @ 49.2g/t from 61 meters
and727313.073.071m @ 3.07g/t from 72 meters
24BKRC_02980-603576908276327179445-----NSI
24BKRC_03074-603576908276327195445515213.733.731m @ 3.73g/t from 51 meters
24BKRC_03195-603576908256327199445868930.752.253m @ 0.75g/t from 86 meters
24BKRC_03274-60357690829832722444500.000m @ g/t from meters
24BKRC_03395-603576908256327218445888910.890.891m @ 0.89g/t from 88 meters
24BKRC_03477-603576908275327240445707222.024.042m @ 2.02g/t from 70 meters
24BKRC_03595-603576908256327241445858611.091.091m @ 1.09g/t from 85 meters
24BKRC_04069-603576908256327021445-----NSI, Abandoned - flooded stoping intersected. 69m
24BKRC_04598-603576908238327060445969821.603.20Abandoned after lode intersected
24BKRC_049104-603576908238327101445959619.519.511m @ 9.51g/t from 95 meters
24BKRC_058110-603576908239327181445-----NSI
24BKRC_06265-603576908238327219445-----NSI, abandoned before lode intercepted
British King Extension - M37/63124BKERC_00136-603576908219326735444252722.314.622m @ 2.31g/t from 25 meters
24BKERC_00256-603576908200326736445464711.051.051m @ 1.05g/t from 46 meters
24BKERC_00330-6035769082393267554452022211.7223.442m @ 11.72g/t from 20 meters
inc.2021121.4021.401m @ 21.4g/t from 20 meters
24BKERC_00453-603576908219326755445444512.562.561m @ 2.56g/t from 44 meters
24BKERC_00535-603576908259326776445181913.393.391m @ 3.39g/t from 18 meters
24BKERC_00653-603576908240326776445364041.696.764m @ 1.69g/t from 36 meters
24BKERC_00789-603576908202326778445666824.018.022m @ 4.01g/t from 66 meters
and747624.559.102m @ 4.55g/t from 74 meters
24BKERC_00844-603576908258326795445333634.8414.523m @ 4.84g/t from 33 meters
inc.3435111.3511.351m @ 11.35g/t from 34 meters
24BKERC_00960-603576908239326796445505113.543.541m @ 3.54g/t from 50 meters
24BKERC_01080-603576908220326797445686917.697.691m @ 7.69g/t from 68 meters
24BKERC_01147-603576908259326815445273031.193.573m @ 1.19g/t from 27 meters
and404222.134.262m @ 2.13g/t from 40 meters
24BKERC_01265-603576908287327252445-----NSI
24BKERC_01365-603576908289327272445585913.133.131m @ 3.13g/t from 58 meters
24BKERC_01489-603576908267327272445737633.9611.883m @ 3.96g/t from 73 meters
24BKERC_01565-603576908289327291445585913.023.021m @ 3.02g/t from 58 meters
24BKERC_03989-603576908268327293445717432.026.063m @ 2.02g/t from 71 meters
24BKERC_01668-603576908283327331445626421.082.162m @ 1.08g/t from 62 meters
24BKERC_01871-603576908288327351445-----NSI
24BKERC_01968-603576908286327370445-----NSI
24BKERC_02089-603576908267327371445727431.845.523m @ 1.84g/t from 72 meters
24BKERC_02165-603576908287327389445606221.272.542m @ 1.27g/t from 60 meters
24BKERC_02268-603576908288327408446596012.852.851m @ 2.85g/t from 59 meters
24BKERC_02383-603576908270327433446737419.289.281m @ 9.28g/t from 73 meters
24BKERC_02454-603576908287327452446-----NSI, abandoned before lode intercepted
24BKERC_02562-603576908266327453446-----NSI, abandoned before lode intercepted
24BKERC_02674-603576908285327479446676812.332.331m @ 2.33g/t from 67 meters
24BKERC_02768-603576908289327496446525313.003.001m @ 3g/t from 52 meters
24BKERC_02889-603576908268327495446-----NSI
24BKERC_02956-603576908308327514446353612.092.091m @ 2.09g/t from 35 meters
and4041110.4510.451m @ 10.45g/t from 40 meters
24BKERC_03068-6035769082863275144465960153.3053.301m @ 53.3g/t from 59 meters
24BKERC_03189-603576908265327534446778036.3419.023m @ 6.34g/t from 77 meters
inc.7980117.4517.451m @ 17.45g/t from 79 meters
24BKERC_03274-603576908284327553446-----NSI
24BKERC_03374-603576908286327573446525311.161.161m @ 1.16g/t from 52 meters
and575815.035.031m @ 5.03g/t from 57 meters
24BKERC_03468-603576908220326776445575814.494.491m @ 4.49g/t from 57 meters
24BKERC_03686-6035769082213268154457577212.7025.402m @ 12.7g/t from 75 meters
24BKERC_03989-603576908268327293445717432.026.063m @ 2.02g/t from 71 meters
24BKERC_04483-603576908266327389446737411.681.681m @ 1.68g/t from 73 meters


Diamond Drilling Commencing Soon

Twinning diamond drilling of 6 selected high-grade interceptions will commence towards end September 2024 to obtain large volume, representative samples for structural, metallurgical and petrographic test work.

British King Resource Update
The British King Mineral Resource is currently being updated to include the results of the recent RC drilling. The Company’s 100% owned British King Mine Area has a NI43-101 Inferred Mineral Resource of 105,000 tonnes at 6.35 g/t Au for a total of 22,400 ounces.

The British King Extensions, 100% owned by the South Darlot Joint Venture in which the Company owns a 70% interest, has an NI43-101 Inferred Resource 71,000 tonnes at 5.64 g/t Au for 12,830 ounces at a gold price of $AUD 3,000/ounce. Both Inferred Resources have a top cut of 35 g/t Au (as per NI 43-101 report dated 18/5/2023 entitled “NI43-101 Technical Report South Darlot Gold Project Updated for the 2022-2023 Exploration Western Australia”).

central-iron-ore-limited-figure7.png

Figure 7. British King Mine Area and Extensions

British King Project (Western Australia)
The Company’s British King Project is located across the British King Mine situated on the M37/30 Mining Tenement, approximately 320km northwest of Kalgoorlie and 60km east of Leinster in Western Australia (Figure 8).

central-iron-ore-limited-figure8.jpg

Figure 8. British King Project Location

QUALIFIED PERSON

Mr Andrew Bewsher who is a Member of the Australian Institute of Geoscientists and has compiled the information within this report relating to the RC drilling programme. Mr Bewsher has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity currently being undertaken to qualify as a Competent Person as defined in NI 43-101.

On behalf of the Board of Directors
CENTRAL IRON ORE LIMITED

“David Deitz”
____________________________
David Deitz, Director/CEO

For further information, please contact:
www.centralironorelimited.com

Investor and Media Inquiries:
Direct: +61 2 9397 7521

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO UNITED STATES SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.

Cautionary Note Regarding Forward-Looking Statements

This news release contains forward-looking information within the meaning of Canadian securities laws. Although the Company believes that such information is reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking information is typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. The Company cautions investors that any forward-looking information provided by the Company is not a guarantee of future results or performance, and that actual results may differ materially from those in forward looking information as a result of various factors, including, but not limited to, the state of the financial markets for the Company’s equity securities, the state of the market for iron ore or other minerals that may be produced generally, recent market volatility; variations in the nature, quality and quantity of any mineral deposits that may be located, the Company's ability to obtain any necessary permits, consents or authorizations required for its activities, to raise the necessary capital or to be fully able to implement its business strategies and other risks associated with the exploration and development of mineral properties. The reader is referred to the Company's disclosure documents for a more complete discussion of such risk factors and their potential effects, copies of which may be accessed through the Company’s page on SEDAR at www.sedar.com.

Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/6e3e72f0-454a-43fc-a650-778ebbcb199b
https://www.globenewswire.com/NewsRoom/AttachmentNg/29419020-fa7e-4a26-8e79-ad78cfac3dcf
https://www.globenewswire.com/NewsRoom/AttachmentNg/fd8605ea-9290-45ce-bc2b-d39a00a6b45c
https://www.globenewswire.com/NewsRoom/AttachmentNg/7bb2f8ed-3e3e-4979-ae9d-4684a0f27bad
https://www.globenewswire.com/NewsRoom/AttachmentNg/b9f4590d-0957-47a6-b60a-0a7e7aec3c7b
https://www.globenewswire.com/NewsRoom/AttachmentNg/f272b219-e017-40c6-99e9-2c5cc22c7986
https://www.globenewswire.com/NewsRoom/AttachmentNg/2d55181d-29ba-4a0b-9265-92c5fb138333
https://www.globenewswire.com/NewsRoom/AttachmentNg/782b7252-f03d-4a90-843f-83eb38dfec04

ABN: 32 072 871 133


Central-Iron-Ore-Limited.png