General Motors Co to Provide an Update on Factory ZERO - Conference Call Transcript
Good afternoon. Welcome, everyone. I'm Jim Quick. I'm the Plant Executive Director here at Detroit-Hamtramck Assembly Center, Factory ZERO.
Before we get started -- yes. Before we get started, I'd like to bring safety to the forefront for us. So we're not expecting any weather today, but in the event that we do have weather, we need to take shelter, we'll head back down the aisle that most all of you walked up and we'll get to the take shelter area, which is our locker rooms. If we do need to evacuate, we will head in the same direction and then meet at the rally point, and I'll make sure that everyone is safe in the event of those 2 things happening.
I also want to thank everyone in advance for abiding by our COVID protocols. I'm proud to say that Factory ZERO was one of the first plants to implement General Motors' fantastic COVID protocols that have kept everyone safe and has kept our fabulous project on time. I also want to recognize and just remind everyone that this is very much an active construction site. The high-vis vests and the helmets, in addition to the masks and the
Access to All Earning Calls and Stock Analysis | |
30-Year Financial on one screen | |
All-in-one Stock Screener with unlimited filters | |
Customizable Stock Dashboard | |
Real Time Insider Trading Transactions | |
8,000+ Institutional investors’ 13F holdings | |
Powerful Excel Add-in and Google sheets Add-on | |
All data downloadable | |
Quick customer support | |
And much more... |